Trang chủ : bieu-cuoc-dich-vu-container Home
 

 menu

 

 

 stock

 
 

 Liên kết website

 

 Online:

 

 Containers

 

TARIFF FOR SERVICES

APPLIED BY JUNE 01st, 2012

Unit:: VNĐ/container

 

No.

KIND OF SERVICES

UNIT PRICE (included VAT)

20'

40'

>40'

20'RF

40'RF

>40'RF

A

CONTAINER HANDLING CHARGES

I

OPERATIONS AT C.Y

1

Lift on/off empty container at C.Y

240,000

370,000

495,000

285,000

425,000

 

2

Lift on for nominated container (empty)

250,000

420,000

535,000

275,000

455,000

 

3

Lift on/off laden container at C.Y (outbound)

265,000

475,000

560,000

275,000

495,000

 

4

Lift off outbound laden container from truck to outbound C.Y for inspection (be noted “lift off for inspection” on packing list, if any)

430,000

765,000

900,000

515,000

920,000

 

5

Lift off container from upper layer at outbound C.Y for inspection – container moving charge will be additional charged (if any) at Item D

155,000

280,000

330,000

240,000

425,000

 

6

Lift off for repairing and installing equipments

155,000

230,000

320,000

175,000

265,000

 

II

OPERATIONS AT WHARF

1

Lift on/off empty container from barge to C.Y (outbound)

380,000

570,000

715,000

460,000

660,000

 

2

Lift on/off laden container from barge to C.Y (outbound)

515,000

920,000

1,035,000

620,000

965,000

 

3

Lift on/off laden container from C.Y to barge (inbound)

 

 

 

 

 

 

 

From the 1st day to the 5th day

550,000

860,000

1,135,000

595,000

930,000

 

 

From the 6th day to the 10th day

610,000

955,000

1,250,000

725,000

1,105,000

 

 

From the 11th day onwards

665,000

1,035,000

1,380,000

770,000

1,185,000

 

B

CONTAINER STUFFING/UNSTUFFING CHARGES

I

OPERATIONS AT C.Y

1

Arranging containers at C.Y for stuffing (outbound)

640,000

910,000

1,160,000

825,000

1,175,000

 

2

Manual stuffing/unstuffing old machinery and equipment

1,130,000

1,570,000

1,960,000

 

 

 

3

Group IMO 03, 04, 08,09,

gas 02, except resin

1,130,000

1,570,000

1,960,000

1,470,000 

2,010,000

 

4

Group IMO 05, 06, chemical  02

2,265,000

3,145,000

3,930,000

2,950,000 

4,040,000

 

5

Manual Stuffing/unstuffing seafood, brick (loaded on pallet)

1,420,000

2,075,000

 

1,440,000

2,095,000

 

6

Combined stuffing charge <50% (excluding lifting on/off charges)

125,000

230,000

265,000

170,000

285,000

 

7

Combined stuffing charge >=50% (excluding lifting on/off charges)

250,000

515,000

530,000

345,000

575,000

 

8

Unstuffing for inspection <50% (excluding lifting on/off charges)

250,000

515,000

530,000

345,000

575,000

 

9

Unstuffing for inspection >=50% (excluding lifting on/off charges)

505,000

920,000

1,060,000

690,000

1,150,000

 

10

Arranging Container at C.Y for unstuffing and loading on truck

(Excluding additional charges at C.Y)

(Excluding charges plugged)

From the 1st day to the 6th day

750,000

1,055,000

1,320,000

1,015,000

1,430,000

 

From the 7th day to the 15th day

890,000

1,300,000

1,605,000

1,155,000

1,715,000

 

From the 16th day onwards

1,025,000

1,540,000

1,890,000

1,290,000

1,875,000

 

11

Charges for lifting on outbound laden container out of C.Y as per customer’s request for changing port or driving to separate warehouse (adding detention charge counted from the date container lifting off)

265,000

475,000

560,000

275,000

495,000

 

12

Direct delivery (counted from the date entering C.Y)

(Excluding additional charges at C.Y)

(Excluding charges plugged)

From the 1st day to the 6th day

275,000

495,000

575,000

275,000

495,000

 

From the 7th day to the 15th day

405,000

720,000

845,000

405,000

720,000

 

From the 16th day onwards

540,000

760,000

1,130,000

540,000

1,130,000

 

13

Cut seal for direct delivery

(Excluding additional charges at C.Y)

(Excluding charges plugged)

From the 1st day to the 6th day

330,000

530,000

610,000

400,000

630,000

 

From the 7th day to the 15th day

425,000

710,000

840,000

480,000

840,000

 

From the 16th day onwards

550,000

940,000

1,100,000

940,000

1,100,000

 

14

Lift off for inspection and direct delivery (inbound)

(Excluding additional charges at C.Y)

(Excluding charges plugged)

From the 1st day to the 6th day

470,000

780,000

970,000

480,000

830,000

 

From the 7th day to the 15th day

585,000

965,000

1,170,000

585,000

1,000,000

 

From the 16th day onwards

710,000

1,195,000

1,435,000

632,000

1,080,000

 

(Unstuffing charge will be charged additionally if customer requests for unstuffing (worker/forklift))

15

Lift off empty container for repairing, installing equipment

125,000

210,000

290,000

140,000

240,000

 

II

OPERATIONS AT WHARF

1

Arranging containers at C.Y for stuffing cargoes coming from barge/boat
 (general goods, coconut fiber)

1,060,000

1,390,000

 

 

 

 

2

Arranging containers at C.Y for stuffing 50kg-bag-rice coming from boat

1,060,000

1,390,000

 

 

 

 

3

Arranging containers at C.Y for stuffing 25kg-bag-rice coming from boat

1,115,000

1,450,000

 

 

 

 

4

Loading into container with rice from boat/barge by breaking rice bags (within the limited allowed weight of every container)

1,620,000

2,085,000

 

 

 

 

5

Charges of unstuffing from container to barge/boat

 

 

 

 

 

 

+  Normal, odorless, non-toxic goods

1,200,000

1,575,000

 

 

 

 

+  Dirty, smelly and toxic goods, animal bones, IMO

1,800,000

2,360,000

 

 

 

 

6

Bulk unloading to barge/boat from container

 

 

 

 

 

 

+  Normal, odorless, non-toxic goods

850,000

 

 

 

 

 

+  Dirty, smelly and toxic goods, animal bones, IMO

1,275,000

 

 

 

 

 

7

Charges for loading inbound goods to wharf, bulk unloading to boat/barge & delivering empty container back to empty C.Y

 

 

 

 

 

 

From the 1st day to the 6th day

690,000

965,000

 

 

 

 

From the 7th day to the 15th day

770,000

1,080,000

 

 

 

 

From the 16th day onwards

840,000

1,185,000

 

 

 

 

8

Charges for moving container from inbound laden container’s C.Y to wharf for unstuffing and delivering empty container back to empty container’s C.Y

 

 

 

 

 

 

From the 1st day to the 6th day

845,000

1,185,000

1,435,000

 

 

 

From the 7th day to the 15th day

975,000

1,415,000

1,655,000

 

 

 

From the 16th day onwards

1,105,000

1,895,000

2,140,000

 

 

 

9

Charges for unstuffing from wharf to boat/barge (excluding lifting on/off & delivery charges) (bags provided by customer, including packing, closing bag)

Bag: 35,000đ/ton
Bulk: 50,000đ/ton

 

 

 

C

CHARGES FOR REEFER CONTAINER

1

Charges for lifting off reefer container for PTI

 

 

 

140,000

240,000

 

2

PTI reefer container

(excluding lif-on/lift-off charges)

 

 

 

380,000

380,000

 

3

Charges for electricity and running reefer container (PTI) (< 12h = half day; > 12h = 01 day)

Depending on each specific case

D

OTHER CHARGES

1

Charges for weighting empty container at C.Y (including: lifting on/off, internal transport and weight)

320,000

555,000

 

 

 

 

2

Charges for weighting laden container at C.Y (including: lifting on/off, internal transport and weight)

460,000

825,000

 

 

 

 

3

Charges for weighting empty container on customer’s truck

105,000

185,000

 

 

 

 

4

Charges for weighting laden container on customer’s truck

170,000

285,000

 

 

 

 

5

Charges for weighing retail goods

5.000 tons ( > 7 tons will be charged 40.000VNĐ/ time)

6

Lacing container flat rack (loading 01empty flat rack up to 01 other empty flat rack)

230,000

400,000

415,000

l

 

 

7

Charges for loading cargoes from wharf to boat/barge or vice versa

65,000VNĐ/ton

 

 

 

8

Moving container as per customer’s request for inspection

120,000

180,000

220,000

130,000

200,000

 

 

Basing on the actual container quantity to be moved to get customer’s container (confirmed by Operation Department)

9

Using small forklift for stuffing/unstuffing (additional charges)

Depending on each specific case

E

ADDITIONAL CHARGES

1

Additional charges for C.Y (applied for inbound laden container from the 4th day after entering C.Y)

21,000

25,000

32,000

 

 

 

2

Additional charges for detention (if arranging container at C.Y for over 36 hours)

210,000
/day

315,000
/day

380,000
/day

315,000
/day

420,000
/day

 

3

Additional charges for arranging container at C.Y for the 2nd stuffing (customer doesn’t stuff after arranging container at C.Y as per registration)

230,000

400,000

515,000

250,000

425,000

 

4

Changing vessel (outbound goods)

Depending on each specific case

5

Charges for transporting export cargo to Cat Lai

Depending on each specific case

6

Charges for changing port to Tan Thuan for departure

Depending on each specific case

 

Notes:              

 

·        Moving inbound laden container will be charged for Customs’ seal and lead:20.000VNĐ/ cont

 

·        Cont TANK, OT, FR (laden & empty cont) will be increased 50% compared with above tariff

 

·         Dangerous goods:

 

                     - Group 3,4: increasing 50%

                          - Group 2,5,6,8,9: increasing 100%

 

·        Oversize & overweight laden container: be discussed on each specific case

 

·        Charges for changing port to Cat Lai , Tan Thuan for departure can be changed in accordance with seaport’s tariff.

                               

                    ________________________________________________

 

DONG NAI PORT JOINT STOCK COMPANY


 

 notice

 
 

 shipping lines

 
 

 company links

 
Back to top
ĐĂNG NHẬP